Client: Verus Construction LTD

Job Description: Carry out tarmac and resin works for Verus Constuction LTD on behalf of their client. 40x ton of 20mm base coat tarmac was laid prior to a UV stable resin bound finish.

Due to the size of the area more manpower was required to achieve a seamless resin finish. We needed 2x mixers running simultaneously, with a 10 person team, completing the job in 6 hours.

Area: Leeds, West Yorkshire

Size: 320m2