Job Description: Excavate and remove existing driveway and patio, Lay MOT type 3 sub base, lay open grade tarmac base coat, install electric lights to both sides of driveway, build front and rear bull nose steps supplied by Marshalls, UV stable resin finish in 2 x colours.

The customer had this particular design in mind which we were able to achieve after several site visits and planning. The frontage of the property needed a modern look as a final part of modernising the entire house.

Area: Horsforth, Leeds, West Yorkshire

Size: 120m2

Gallery